The company has established a railway GSM-R/5G-R laboratory. The laboratory uses two independent 2M E1 data lines to achieve direct connection with the operation and maintenance center of the National Railway Group. Through in-depth analysis of the causes of faults and simulation of the repair process, it solves the offline simulation, training, testing experiments of the existing core networks of 18 railway bureaus, as well as the reproduction of faults in the current railway network, thereby improving the efficiency of fault detection and repair.



Copyright © 2026 Nanjing Ticom Technology Co., Ltd. 苏ICP备10090022号 技术支持:网站建设、GEO运营:江苏苏宝网络